Whole-House Generator Cost Calculator for Florida (Installed)
Get a Florida installed-cost range for a standby generator, with every line item shown. A typical 18 kW natural-gas install in Central Florida comes out near $11,400 (range $9,400–$16,000). Change any input and the estimate updates instantly. Nothing is sent to a server. Not sure what size you need? Size your generator first.
Cost calculator
About $12,000 installed
Range $9,800–$16,600
22 kW air-cooled, natural gas
- The high estimate includes a gas meter upgrade in case your utility requires one.
Where the money goes (typical)
- Generator and switch $6,800
- Electrical work $3,000
- Fuel hookup $900
- Pad and site $450
- Permits and engineering $400
- Sales tax $490
| Item | Low | Typical | High |
|---|---|---|---|
| 22 kW generator with 200 A transfer switch | $6,200 | $6,800 | $7,300 |
| Electrical installation | $2,000 | $3,000 | $4,500 |
| Gas line and hookup | $675 | $900 | $1,350 |
| Gas meter upgrade | $0 | $0 | $1,500 |
| Composite pad | $350 | $450 | $600 |
| Permit and inspections | $150 | $400 | $850 |
| Sales tax on equipment | $447 | $490 | $530 |
| Installed total | $9,822 | $12,040 | $16,630 |
What's in a standby generator installation
- Generator. The unit itself. Air-cooled sizes up to 26 kW come with a 200 A automatic transfer switch.
- Transfer switch. Liquid-cooled generators (32 kW and up) need one bought separately, and 400 A service needs a second.
- Electrical work. Wiring from the generator to the transfer switch and panel. The estimate includes 20 feet; longer runs cost more.
- Fuel hookup. A gas line from your meter, or a propane line and tank. Some gas meters need an upgrade to feed a generator.
- Pad. A composite or poured concrete pad the generator sits on, raised on a platform in a flood zone.
- Permits and engineering. Building permits and inspections, plus an engineer's letter for wind or flood rules where needed.
- Add-ons. Soft starters for AC units, load-management modules and panel upgrades.
- Sales tax. On the equipment, at 6% plus your county surtax.
Cost by size
Typical installed totals in Central Florida with the calculator's default site: 25 feet of gas line, 20 feet of wiring, composite pad, 200 A service.
| Size | Natural gas | Propane (tank bought) |
|---|---|---|
| 14 kW | $10,500 $8,400–$15,100 | $12,000 $9,400–$15,600 |
| 18 kW | $11,400 $9,400–$16,000 | $12,900 $10,400–$16,500 |
| 22 kW | $12,000 $9,800–$16,600 | $13,500 $10,800–$17,100 |
| 26 kW | $13,000 $11,000–$17,600 | $14,500 $12,000–$18,100 |
| 38 kW (liquid-cooled) | $26,700 $23,300–$34,400 | $28,200 $24,300–$34,900 |
Natural gas vs propane in Florida
Generators make less power on natural gas than on propane. This calculator assumes 87% of the propane rating, so a house on natural gas sometimes needs the next size up. Natural gas is the cheaper hookup when a gas line already reaches your house, but some meters need an upgrade.
Without natural gas, you'll need a 500-gallon propane tank. You can use one you already have, buy one aboveground or underground (underground costs more but stays out of sight), or lease one for a yearly rent. New tanks are filled to 80%, about 400 gallons. At $5 a gallon, the first fill costs about $1,880; the calculator shows it apart from the installed price.
Florida permit, wind and flood requirements
Every Florida county requires a permit and inspections for a standby generator, usually for both the electrical work and the gas or propane line. The generator has to be anchored to its pad to meet Florida Building Code wind loads. Miami-Dade and Broward are in the High-Velocity Hurricane Zone, where the rules are stricter, so the calculator adds an engineering letter by default for South Florida.
In a flood zone, equipment usually has to sit at or above the base flood elevation, which means a raised platform and often an engineer's letter. Your county building department sets the exact rules, so ask your installer what your county requires.
How a soft starter or load management cuts the price
An AC compressor draws a big surge for a moment when it starts, and that surge often sets the generator size. A soft starter cuts the surge. For a typical Central Florida home with one 3-ton AC, adding one drops the size from 18 kW to 14 kW and saves about $300 after paying for the soft starter.
Load management lets big appliances like the water heater, range and dryer take turns instead of running all at once. For a whole-home house with a pool, it drops the size from 38 kW to 22 kW and saves about $13,500, mostly by avoiding a liquid-cooled unit.
Check your own home with the AC soft starter calculator.
Worked examples
- Central Florida, 3-ton AC plus essentials, natural gas: 18 kW, about $11,400 ($9,400–$16,000).
- The same home in a Miami flood zone: 18 kW, about $15,600 ($11,600–$24,100). The raised platform, engineering letter and higher labor rates add the difference.
- Whole home with two AC units, a pool and electric appliances: 38 kW liquid-cooled, about $26,700 ($23,300–$34,400).
- That whole home with load management: 22 kW, about $13,200 ($10,600–$18,400).
Frequently asked questions
- Can my HOA stop me from installing a standby generator?
- Florida law counts exterior fixed generators and fuel tanks as hurricane protection (section 720.3035(6), Florida Statutes). Your HOA can adopt specifications, such as color and style, and can ask you to match the community's look, but it can't deny an application that meets those specifications. Ask for the specifications before you sign a contract.
- Can I finance a whole-house generator?
- Many installers offer financing. Florida PACE programs may also finance a generator with no upfront payment and repay it through your property tax bill. Compare the rate and fees with other loans, and check how PACE affects selling or refinancing your home.
- How long does installation take?
- The work at your house usually takes one to three days. Permits, inspections and the gas or propane hookup often stretch the whole job to several weeks, and longer right after a storm.
- Should I buy the generator online and hire someone to install it?
- Usually not. Many installers won't install equipment they didn't supply, and some warranties depend on an authorized dealer doing the install. Ask the installer and check the warranty terms before you buy.
- Does the estimate include sales tax?
- Yes. It adds Florida's 6% sales tax plus your county surtax on the generator, any separate transfer switch and a precast pad. The county surtax applies only to the first $5,000 of each item. Labor and installed items are treated as tax-included.